Claim for Extension of Time and Associated Costs: Msheireb Downtown Doha, Qatar, Enabling and Raft Works for Phase 4

MASTER: Contract, claim and delay management in construction works AUTHOR: Amjad Nawaz TUTOR: Eng. Giovanni Franchi   This case study for the Master’s thesis in Contract, Claim, and Delay Management in Construction Works encompasses the preparation of a Contractor’s claim for Extension of Time and associated costs due to the extended period for the Project […]

BIM, PROJECT MANAGEMENT

The application of BIM philosophy to a residential project “Terrazze Talenti” with an integration of Project Management techniques

MASTER: Project management in construction works with BIM AUTHOR: Arch. Ozlem Bozkaya TUTOR: Eng. Giovanni Franchi   The Talenti district of Rome is set to host a new urban oasis where innovative architecture and nature converge in a unique residential project. Designed by Vittorio Grassi Architects, the *Terrazze Talenti* complex introduces a novel vision of […]

PROJECT MANAGEMENT

Applicazione dell’Earned Value Management (EVM) nei progetti infrastrutturali: Un caso di studio sulla linea 17.2 della metropolitana di Parigi

MASTER: Project and contract management in construction works AUTHOR: Alessia Rui TUTOR: Giovanni Franchi   I grandi progetti infrastrutturali sono spesso soggetti ad un aumento imprevisto dei costi e all’accumulo di ritardi rispetto ai tempi di realizzazione previsti. Al fine di evitare ciò, è di fondamentale importanza valutare e monitorare la durata e i costi […]